Sunday, July 19, 2009
Summer Fun at Willard Bay. . .
Sunday, July 5, 2009
Tyler and his Projects. . .
Hover Project Supervisor - Max Oliver
Planning Session and Instructions. . .
Get on your Mark, get set
Oops!!! Try again. . .
There we go!!!
Swing her around.
VoilĂ !!! Much better!!!
Tyler you did a great job. That was a lot of work. It was even more work putting new sod down and changing sprinklers to match. You did a GREAT job. Thank you!
Tyler's other projects that he has completed between school (Masters), school, (CFII), and his job instructing have been: ripping the downstairs bathroom apart to replace the sheet rock and cement, replacing sheet rock, tiling the shower walls and bathroom floor, replacing the toilet, replacing the toilet again (he broke the first one - oops!), What started this bathroom project? Well, Tyler and Crystal were playing and rough housing on the stairs. He put Crystal through the sheet rock with one shove!!! Then, they realized the basement floor was wet. It had been leaking for a while. As we speak, he is sealing the tile in the bathroom. I had to rescue him because he almost passed out from the toxic fumes. He is almost done and it looks great!!!
Now, it is time for him to concentrate on SCHOOL and only SCHOOL. No more projects - I am broke!!!
Thursday, June 11, 2009
Lake Powell 2009!!!
The houseboat is 75 feet long with 4 bedrooms and 2 bathrooms. Many of us preferred to sleep on the 3rd level deck under the stars.
We took a swim and here I am looking through the port holes in my life jacket! For some reason, unknown to me, I look just like Millie.